
Water Lock Safety Monitoring Project for a River Basin Management Authority
Leverage research achievements in hydraulic structure monitoring to establish a continuous water and engineering condition monitoring system during the flood season.
Multi-point placement
Monitoring Point
Continuous Auto
Collection Method
Industry-University-Research Cooperation
Source of Results
Project Background
The water gates under the management authority have been in operation for a long time. Existing monitoring points are scattered, and flood season data collection relies on manual records, resulting in insufficient timeliness.
Customer Request
Establish a continuous monitoring system to provide data support for engineering scheduling and safety assessment.
Solution Components
- Develop a monitoring point layout plan based on research achievements in hydraulic structure safety monitoring.
- Select low-power sensing terminals to adapt to field power and communication conditions.
- Configure flood season encryption collection policies to increase data density during critical periods.
- Build a monitoring platform and generate structural safety assessment reports.
Implementation & Delivery
Technical validation is provided by the industry-academia-research collaboration team, while Wuyuanji Intelligent's in-house R&D team handles equipment selection, on-site implementation, and platform deployment.
Project Site Documentation
On-site installation, commissioning, and operation views to help define implementation boundaries and working conditions.

Other Project Cases
View all casesTell us about your on-site situation
Device type, operating conditions, and existing system status are prerequisites for developing a feasible solution. After you submit your inquiry, our technical team will contact you to assist further.



